HVAC and plumbing system components in the Secret Garden Cannabis facility, featuring water filtration systems, pressure gauges, and piping, demonstrating mechanical solutions for cannabis cultivation in Anchorage, AK.

Secret Garden Cannabis – HVAC, Plumbing, Cooling

Anchorage, AK

Project Summary:

General Contractor: MCN
Engineer: SCOPE Engineering
Project Duration: April 2018 – July 2019
Services Provided: Mechanical, HVAC, Plumbing, Cooling

Relevant Team Members:

Project Manager: Jason Lee
Plumbing Operations Supervisor: Randy Switzer
Sheetmetal Operations Supervisor: Lorne Green

Project Description:

Secret Garden Cannabis is a state-of-the-art cannabis shop in down town Anchorage. This facility has 4 grow rooms, fertigation room, Ro system, commercial kitchen, manufacturing room, 2 dry rooms, gowning room, active mothering, growing lab and propagation room. They offer tours throughout the facility to see the operation in progress.

  • This Facility comes with 4 Grow rooms, 2 of which have windows for the public to tour. These grow rooms have a fertigation system piped underground, which will keep each plant fertilized for optimal growth.
  • Each grow room has 4 air conditioning units with cooled Glycol to keep the plants at an ideal temperature for growing. There are dehumidifiers in each grow room to keep the moisture at a perfect density to maximize plant growth.
  • This facility has a state-of-the art fertigation room which houses 14 – 300 gal tanks that has a fertigation mix that keeps the plants feed for the best possible growth. Each room throughout the facility has the fertigation piping capabilities.
  • This facility offers an exhaust system that includes carbon filters throughout the building to keep cannabis growing smells from escaping from the facility into the air outside.