Secret Garden Cannabis – HVAC, Plumbing, Cooling

Anchorage, AK

Project Summary:

General Contractor: MCN
Engineer: SCOPE Engineering
Project Duration: April 2018 – July 2019
Services Provided: Mechanical, HVAC, Plumbing, Cooling

Relevant Team Members:

Project Manager: Jason Lee
Plumbing Operations Supervisor: Randy Switzer
Sheetmetal Operations Supervisor: Lorne Green

Project Description:

Secret Garden Cannabis is a state-of-the-art cannabis shop in down town Anchorage. This facility has 4 grow rooms, fertigation room, Ro system, commercial kitchen, manufacturing room, 2 dry rooms, gowning room, active mothering, growing lab and propagation room. They offer tours throughout the facility to see the operation in progress.

  • This Facility comes with 4 Grow rooms, 2 of which have windows for the public to tour. These grow rooms have a fertigation system piped underground, which will keep each plant fertilized for optimal growth.
  • Each grow room has 4 air conditioning units with cooled Glycol to keep the plants at an ideal temperature for growing. There are dehumidifiers in each grow room to keep the moisture at a perfect density to maximize plant growth.
  • This facility has a state-of-the art fertigation room which houses 14 – 300 gal tanks that has a fertigation mix that keeps the plants feed for the best possible growth. Each room throughout the facility has the fertigation piping capabilities.
  • This facility offers an exhaust system that includes carbon filters throughout the building to keep cannabis growing smells from escaping from the facility into the air outside.