Alaska Airlines Kodiak Airport Upgrades

Kodiak, Alaska

Project Summary:

Gen. Contractor: Cornerstone General Contractors, Inc.
Engineer: RSA Engineering
Project Duration: September 2016 – June 2017
Services Provided: Mechanical, HVAC, & Ventilation Systems

Relevant Team Members:

Project Manager: Michael Hunsicker
Plumbing Operations Supervisor: Randy Switzer
Sheetmetal Operations Supervisor: Shannon Massey

Project Description:

The Alaska Airlines Terminal Upgrades project located in Kodiak, AK was a reconfiguration & remodel.  This was a complex project requiring a high level of coordination effort.  The project was proposed by Alaska Airlines to include the following:

  • While maintaining operations, phased demo and reconfigure space within existing building shell to include ticketing, TSA passenger and baggage screening, restrooms, tenants, lobby and hold rooms.

  • Provide entire mechanical system shop drawings.

  • Full mechanical systems replacement; plumbing and HVAC.

  • Furnish and install new fuel oil system.

  • Pipe and duct insulation, BAS installation, air / water systems balancing.

  • Provide training and perform building systems commissioning.

  • Build-out new interior larger secure hold room w/restroom added (tre