Super 8 LaQuinta Remodel

Anchorage, Alaska

Project Summary:

General Contractor: Hospitality Builders, Inc.
Engineer: RSA Engineering, Inc.
Project Duration: November 2016 – August 2017
Services Provided: Mechanical, HVAC, & Ventilation Systems

Relevant Team Members:

Project Manager, Michael Hunsicker
Plumbing Operations Supervisor, Randy Switzer
Sheetmetal Operations Supervisor, Shannon Massey

Project Description:

The Super 8 to a La Quinta Remodel project located in Anchorage, AK was a conversion of a existing lodging facility.  This 3-story hotel contains 56 Guestrooms and suites, Lobby, Breakfast Area, Business Center, Sundry shop, Indoor/Outdoor pool and spa, Fitness Center, Guest laundry, Meeting room, Banquet hall, and parking on grade.  Klebs scope of work on this project consisted of the following:

Plumbing:

  • Demolition of existing boilers, pumps, fintube and cabinet unit heaters
  • Installation of owner furnished plumbing fixtures for all guestroom bathrooms
  • Installation of owner furnished PTAC units in all rooms
  • Furnish and install new boilers (B-1, B-2), pumps (CP-3, 4, 5, 6, 7), fintube (FT-1) and floor sink (FS-1)

HVAC:

  • Demolition of existing exhaust fans, wall caps and air conditioners in all rooms
  • Demolition of combustion air louver, make-up air louver/damper
  • Furnish and install new toilet exhaust fans (TEF-1) and wall caps in all rooms
  • Furnish and install air handling unit (AHU-1), condensing unit (CU-1), along with all duct, diffusers and refrigeration piping
  • Furnish and install louvers, control dampers, backdraft damper and ventilation fan (VF-1)
  • Concrete cutting for the supply air duct into the crawl space

Also:

  • Seismic restraints and engineering for our mechanical equipment, piping and ductwork.
  • Pipe and duct insulation, temperature controls, air/water system balancing.