Midway Airport Operations FacilityMidway Atoll National Wildlife RefugeDue to Midway Island's strategic location in the South Pacific, the FAA through the island's manager (US Fish & Wildlife Service) decided to design and construct a 4,000-square-foot airport operations facility. The work consisted of installation of a split system HVAC unit and associated ductwork & diffusers for 1,000 square feet of offices, radio room cooling system, shop oil/water separator, trench drain, catch basin, restroom, and sewer/septic leach field system. An emergency generator was installed including ventilation, generator exhaust, fuel oil storage tank, and fuel oil piping. |
Owner: US Department of the Interior Fish & Wildlife Service Engineer: RBA Engineers Inc. Contract Value: $321,000 Project Duration: June 2007 — December 2007 Services Provided: Building Mechanical, HVAC, and Plumbing |